18 March 2013: We do a big push in the facade modelling project every Monday. This is the last monday of term and we would like to test the models before the end of term, but that looks unlikely. we can't get all the materials in time from the stores. We may be testing in the wind tunnel during the vacation.


DNC Tests the first model to be nearly complete - the baseboard is on a roller base and can be shaken with a metronome to give timing.


The lattice facade model is progressing, but it is awfully hard work with so many bolts to do up.